On the Kirchberg plateau, the former Kronos headquarters is being dismantled to make way for the Kennedy Park project. As part of this rebuilding effort, BGL BNP Paribas has brought its teams together in the interconnected complex housing three major buildings, seKoia, eKinox and oKsigen, complemented by the Espace weicKer, a private area dedicated to its exclusive clientele.
For a complex of this scale, with 18,500 m² spread over 8 floors and designed to accommodate 1,100 workstations, flow signage and wayfinding become the central pillars of the experience for employees and visitors.
For us, the answer lies in a combined approach of Wayfinding and Placemaking. Our mission goes beyond simple direction: we use design to connect people with spaces. By structuring the visual identity, we create intuitive landmarks that give each building its own personality while drawing a logical and natural network.
To respect the distinct purpose of each place, we developed a global visual system based on a specific color code: 4 spaces, 4 colors. This common thread ensures logical consistency, from the external entrances to the interior facilities. It allows us to harmoniously design every type of signage the buildings need: directional, corporate, technical or safety.
Carrying out a project of this scale demonstrates our controlled approach: complex challenges and large volumes fuel our creativity. Our strength lies in combining strategic and creative rigor with high technical mastery. Do you have a signage challenge for us? Let’s discuss your ambitions together.